GSP (iPath S&P GSCI Total Return Index ETN) is no longer actively trading.
This usually means the company was acquired and taken private, delisted from its exchange, or its ticker has been retired. Every price, valuation, dividend, and analyst figure on this page is frozen at the last available trading session and reads as historical reference — not a current-day signal.

GSP does not currently pay a dividend.
See exactly how GSP's revenue becomes profit — a Sankey that traces revenue (and its reported segments) through gross profit, operating expenses, and net profit, with the year-over-year change on every line.
The same diagram the Chart Builder draws, right on the Summary tab. Upgrade to unlock it for GSP and 80,000+ other tickers.
The S&P GSCI Total Return Index aims to reflect the overall performance an investor could achieve by holding a direct, non-leveraged position in the commodity contracts that make up the S&P GSCI, combined with the interest income generated from allocating the necessary capital to these contracts at the prevailing Treasury Bill rate.

Saskatoon, Saskatchewan--(Newsfile Corp. - July 13, 2026) - Gensource Potash Corporation (TSXV: GSP) (FSE: UGN) (OTC Pink: AGCCF) today provided a comprehensive update on the Technical Refresh workstreams for its now up-sized Tugaske Project ("Project" or "Tugaske"), confirming that all required disciplines are now fully engaged as the Company advances toward an updated NI 43-101 Technical Report. The Technical Refresh, which officially commenced in March 2026 (March 6, 2026 Technical Update news release), is progressing on multiple fronts to update the Tugaske Project to a minimum capacity of 500,000 metric tonnes per year—double the size of the original plan.

News Release - Vancouver, British Columbia – TheNewswire - July 8, 2026: GSP Resource Corp. ( TSX-V:GSPR / FSE: 0YD / OTC:GSRCF ) (the “ Company ” or “ GSP ”) announces that approximately 1,150 metres of drilling across four drill holes have now been completed at the Alwin high-grade gold target of the 2026 drilling program. Core from the initial four holes is currently being split and logged prior to shipment to ALS Analytical Labs in Kamloops, BC. These four holes are step-out drill holes from the discovery of high-grade gold values drilled in late 2024 in step-out hole AM-24-06 that yielded 5.04 grams-per-tonne (g/t) Gold (Au) and 1.01% Copper (Cu) over 7.90 metres (m); including 22.93 g/t Au and 1.82% Cu over 1.64 m 1 . Observations of the core have identified several quartz-chlorite-sericite, and chalcopyrite-pyrite (±bornite) mineralized zones in each of the drill holes having similar visual characteristics to those drilled in 2024.

News Release - Vancouver, British Columbia – TheNewswire - June 15, 2026: GSP Resource Corp. ( TSX-V: GSPR / FSE: 0YD / OTC: GSRCF ) (the “ Company ” or “ GSP ”) announces that 2026 drilling at the combined Alwin-Mer properties located in the Highland Valley Copper Camp of British Columbia has commenced. The first phase of 2026 drilling is targeting both porphyry copper potential at the Mer property and follow-up drilling to a gold discovery drilled at Alwin in late 2024. The first phase of drilling is expected to total between 1,200 and 1,500 metres.

Saskatoon, Saskatchewan--(Newsfile Corp. - June 8, 2026) - Gensource Potash Corporation (TSXV: GSP) ("Gensource" or the "Company") today announced that it has engaged Fundamental Research Corp. ("Fundamental Research") to provide ongoing research coverage on the global potash industry and on Gensource's specific position within the sector. In addition, the Company announces that it will present at the next Emerging Growth Conference on Thursday June 11th at 15:40 Eastern time.

Vancouver, British Columbia – June 3, 2026 – TheNewswire - GSP Resource Corp. ( TSX-V: GSPR / FSE: 0YD / OTC: GSRCF ) (the “ Company ” or “ GSP ”) announces that field and drill crews have mobilized for the first phase of 2026 drilling at the combined Alwin-Mer properties located in the Highland Valley Copper Camp of British Columbia. Drilling operations are expected to commence over the next 7 days with the initial phase of 2026 drilling targeting both the potential for porphyry copper at the Mer property, as well as follow-up drilling to a gold discovery drilled at Alwin in late 2024. The first phase of drilling is expected to total between 1,200 and 1,500 metres. Alwin High-Grade Gold Targets: