

Vancouver, British Columbia--(Newsfile Corp. - August 24, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce the closing of a non-brokered private placement of 34,582,754 units of the Company (the "Units") at a price of $1.30 per Unit (the "Private Placement") for gross proceeds of $44,957,580. Alpayana S.A.C.

Vancouver, British Columbia--(Newsfile Corp. - August 13, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to provide an update on construction and commissioning activities at its Phase 1 gold-in-oxide heap leach project at the Cuiú Cuiú Gold District, Brazil. Highlights Construction of the wet processing circuit at Cuiú Cuiú is more than 90% complete.

Vancouver, British Columbia--(Newsfile Corp. - August 5, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce that it has appointed Mr. Elton Pereira as Vice President Exploration, effective immediately.

Vancouver, British Columbia--(Newsfile Corp. - July 21, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from 41 additional reverse circulation ("RC") infill drill holes recently drilled as part of the pre-production drill-to-measured resource upgrade and production de-risking of the gold-in-oxide ore within the MG starter pit at the Cuiú Cuiú Gold District, Brazil. Highlights Results have been received on an additional 41 infill RC holes targeting the gold-in-oxide material in the eastern and central parts of the MG starter pit.

Vancouver, British Columbia--(Newsfile Corp. - July 9, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to provide a construction and commissioning update regarding its Phase 1 gold-in-oxide heap leach project at the Cuiú Cuiú Gold District, Brazil. Highlights Construction of the dry circuit for the Phase 1 gold-in-oxide heap leach project is now complete, with total project construction and commissioning now approximately 85% complete, and +90% of project costs committed under contract Mining of gold-in-oxide ore has commenced, with ore being successfully processed by the sizer, agglomerated, and transported by conveyor systems to the heap leach pads The ADR plant has arrived in country and is expected to be on site later this month.

Vancouver, British Columbia--(Newsfile Corp. - June 23, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from reconnaissance core drilling recently conducted at the Mutum target within the Cuiú Cuiú Gold District, Brazil. Highlights DDH387 drilled at the Mutum target and located 450m SE of the PDM gold deposit and 1.5km NW of the Central gold deposit, returned 20.7m @ 1.6 g/t gold from 131.4m depth including 2.5m @ 5.7 g/t gold from 146.0m depth The results from DDH387 suggest the presence of a previously unrecognised mineralized zone at Cuiú Cuiú between the Central and PDM gold deposits which are located 2km apart Several holes returned gold in near surface blanket soils and sediments, notably DDH387 which returned 11.5m @ 0.42 g/t gold from surface, DDH381 which returned 7.5m @ 0.40 g/t gold and DDH383 which returned 4.3m @ 0.58 g/t gold The presence of low-grade gold values in near surface oxide material in several holes suggests that the PDM gold-in-oxide blanket could be significantly larger than currently envisaged.

Vancouver, British Columbia--(Newsfile Corp. - June 11, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased

Vancouver, British Columbia--(Newsfile Corp. - June 2, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from three additional diamond drill core holes recently drilled at the Jerimum Cima target within the Cuiú Cuiú Gold District, Brazil. Highlights Drilling at the Jerimum Cima target, located 3km ENE of the Central gold deposit and 3.5km NW of the MG gold deposit at Cuiú Cuiú, returned 107.6m @ 2.5 g/t gold from 162.7m depth including 17.8m @ 13.0 g/t gold from 232.9m depthincluding 3.8m @ 59.9 g/t gold from 232.9m depthin hole DDH384, all intercepts in primary mineralization The zone intersected in DDH384 is interpreted to be the same zone intersected by previous drill holes which include DDH372 which returned 9.5m @ 87.4 g/t gold including 2.9m @ 285.5 g/t gold and DDH378 which returned 10.2m @ 8.7 g/t gold including 1.3m @ 62.5 g/t gold, as well as other holes which returned 45.6m @ 4.5 g/t gold including 1.5m @ 117.26 g/t gold, and 82.6m @ 0.98 g/t including 9.5m @ 5.74 g/t gold The results from the new core hole DDH384 suggest that the high-grade mineralized zone at Jerimum Cima is continuous along strike for 455m and extends at least 60m further down dip than previously thought to at least 150m depth.
No recent filings indexed.